Case Study

Stamp Office Refurbishment, Edinburgh

01 / Case Study

Stamp Office Refurbishment, Edinburgh

DSSR provided the full MEP office fit-out design to support the refurbishment of the Stamp Office, a Category A listed building in the heart of Edinburgh.

Location  /  Edinburgh


Contract Value  /  £2.5m


Architect  /  3D Reid


Client  /  Trinova


Completion  /  2023


02 / Overview

Overview of the Stamp Office refurbishment project

DSSR provided the full MEP CAT A office fit-out design to support the refurbishment of Levels 1, 2 and 7 alongside the refurbishment of the main reception, toilets and the reconfiguration of the basement to provide new and enhanced amenities to encourage active travel choices.

The project was comprised of refurbishment works at The Stamp Office in Edinburgh.

Works involved the Category A Fit-Out of Levels 02 & 07 Office Spaces, Level 01, 02, 04 & 07 Core Areas, Level 04 Reception, and the reconfiguration of a section of the Level 00 Car Park into a Shower Area and Bike Storage Facility.

DSSR was involved from the outset to provide full Mechanical, Electrical and Public Health Designs. The architectural principle was for a stripped-back, exposed services aesthetic so the coordination and layout of services was vital as they are fully visible within the spaces.

03 / Contact

Let's talk. Please don't hesitate to contact any of our offices.

Contact