Case Study

Arora Hotel, Heathrow Airport

01 / Case Study

Arora Hotel, Heathrow Airport

Hilton London Heathrow Terminal 5 Hotel

Location / Heathrow Airport


Contract Value / £180m


Architect / The Manser Practice (Concept) / EPR Architects (Detail)


Client / BAA Lynton PLC


Completion / 2008


02 / Overview

Overview of the Arora Hotel project

DSSR was appointed to review the infrastructure of the site and set the employer's requirements for Design & Build tender. However, we were subsequently retained by BAA Lynton to act as the client's advisor to review the D&B contractor's specifications, detailed design and standards for the hotel development.

Advice on all aspects of the development

DSSR’s role included:

  • Reviewing the infrastructure of the site to ensure that it was suitable for the development
  • Setting the employer’s requirements for the Design & Build tender
  • Reviewing the D&B contractor’s specifications, detail design and standards
  • Advising the client on all aspects of the development

DSSR’s work on the Hilton London Heathrow Terminal 5 Hotel was a success. The hotel was completed on time and within budget, and it has been praised by both the client and the public. It is a great example of how we our expertise to help clients deliver successful projects.


Key features of the hotel:

  • 605 hotel bedrooms
  • 1,700-delegate conference centre
  • 1,300-person banqueting suite
  • Restaurants and bars
  • Health club
  • Located to the west of the new Terminal 5 at Heathrow Airport