Stepping Hill Hospital:Outpatient Department

01 / Case Study

Stepping Hill Hospital: Outpatient Department

The new three-storey Outpatients Department at Stepping Hill Hospital

Location / Stockport


Contract Value / £24.3m


Architect / Ryder


Client / MTX


Completion / 2025


02 / Overview

Overview of the Stepping Hill Hospital's New Outpatient Department project

The new three-storey Outpatients Department at Stepping Hill Hospital was delivered using Modern Methods of Construction (MMC) in partnership with MTX.

The use of modern methods of construction accelerated the programme while reducing construction waste and on-site disruption, ensuring the hospital continued to operate smoothly throughout. The facility accommodates a dental department, an orthoptic department, and a full floor of consult and treatment rooms, all supported by modern staff and patient facilities. By adopting MMC, the project achieved higher efficiency, reduced carbon impact, and delivered a future-ready healthcare building.

Electrical Infrastructure

A new transformer was integrated into the existing site ring main to supply the development, with generator backup included to ensure resilience and continuity of service. A new LV supply was introduced into the building, feeding a second-floor LV panel that distributed power across all levels and plant areas. Energy-efficient hub cabinets were located on each floor to support ICT and data services, with systems designed to optimise energy use and reduce operational costs. By embedding efficiency into the electrical strategy, DSSR helped deliver a robust infrastructure that supports both current demand and future expansion in a sustainable manner.

Mechanical Systems and Ventilation

DSSR designed and coordinated the installation of two high-efficiency Air Handling Units (AHUs) to provide full mechanical ventilation, ensuring safe, comfortable, and compliant environments across all departments. Heating demand was met through floor-mounted gas boilers, carefully sized to minimise energy consumption, while cooling was provided by VRF and DX systems connected to external air source heat pump (ASHP) condensing units. The inclusion of ASHPs not only reduced reliance on fossil fuels but also supported a more sustainable, low-carbon approach to mechanical services. A new medical gas plant was installed for dental air and vacuum provision, designed for both resilience and efficiency.

Building Services Integration

General electrical services were installed across the dental, orthoptic, and consulting/treatment facilities, with a focus on providing reliable, safe, and energy-efficient systems. Low-energy LED lighting with smart controls was specified throughout to minimise energy use and contribute to sustainability targets. In addition, the new Outpatients Department was seamlessly integrated into the existing site-wide fire alarm system, maintaining safety standards while avoiding unnecessary duplication of systems and materials. This integrated approach not only improved efficiency but also reduced long-term operational carbon impact, supporting the Trust’s wider net-zero ambitions.

03 / Contact

Let's talk. Please don't hesitate to contact any of our offices.

Contact
Close
DSSR is an award-winning international company of Consulting Engineers.
Who have been around for over 80 years specialising in mechanical and electrical services consultancy. We apply this expertise and knowledge to our designs to make the world a more sustainable place.
Close
Sectors
Close
Specialism

Privacy Preference Center