DSSR was responsible for the full M&E Design of a new factory extension for the existing Highland Spring production and bottling facility located in Blackford, Perthshire.

Location  /  Perthshire


Contract Value  /  £5.3m


Architect  /  Hypostyle


Client  /  Highland Spring


Area  /  58,000 ft2


02 / Overview

Overview of the Highland Spring project

DSSR was responsible for the full M&E Design of a new factory extension for the existing Highland Spring production and bottling facility located in Blackford, Perthshire.

At an impressive 58,125 ft², the new bottling hall extension was designed to accommodate a 72,000-litre bottling line with associated pallet storage, loading/marshalling area, staff offices, ancillary facilities, and a conveyor-line extension extending the length of the south elevation.

The extension was for a single-storey building, though high enough to accommodate the production lines and storage requirements (approximately 6.2m).

The extension also included a new circulation bridge that incorporates a lift and stairs and links the existing production spaces to the new first-floor staff accommodation.

Additional external works included the extension of the site access road, a new service yard, external plant space, additional parking spaces, soft landscaping, and a SUDS pond.

03 / Contact

Let's talk. Please don't hesitate to contact any of our offices.

Contact
Close
DSSR is an award-winning international company of Consulting Engineers.
Who have been around for over 75 years specialising in mechanical and electrical services consultancy. We apply this expertise and knowledge to our designs to make the world a more sustainable place.
Close
Sectors
Close
Specialism

Privacy Preference Center